Overhaul of English Electric/GEC EA2 power turbines
¿Podemos licitar?
leído del anuncio · consulta el texto oficial- 01Referencias y facturaciónNo consta en el anuncio
- 02Garantía provisionalNo consta en el anuncio
- 03Certificados y clasificaciónNo se exige nada en el anuncio
- 04LotesUn contrato, sin lotes
- 05Cómo se puntúaNo consta en el anuncio
- 06Plazo y duración—
El texto oficial
This procurement consists of overhaul of one (1) English Electric/GEC EA2 power turbine. The overhaul of Huutokoski unit 5 will take place in 2027. In addition to this, overhaul of four (4) English Electric/GEC EA2 power turbines, shall be quoted as mandatory options 1, 2, 3 and 4 (“Options”). The schedule for executing these options shall be decided later, but are preliminarily planned for years 2028 - 2031. The preliminary scope of supply for Huutokoski unit 5 overhaul consists of: 1) Disassembly of the power turbine to a level in which the rotor discs and stator vanes are removed from the unit 2) Inspection of all relevant parts, components and assemblies. Measurement and record of relevant clearances and dimensions 3) Supply and replacement of all consumables and one life components 4) Supply and replacement of all other potentially required spare parts 5) Repair of any damaged parts, components and assemblies 6) Reassembly of the unit 7) Commissioning The same scope of supply shall be quoted for the Options.
Anuncios
- 11 nov 2026Anuncio de licitaciónfuente ↗
¿Cuáles de estas licitaciones podría ganar tu empresa?
Escribe tu NIF: verás los contratos públicos anteriores de tu empresa, las licitaciones abiertas que encajan y cuántas ofertas suele recibir cada comprador público.